BWI Three Fully-Automated Triturator Buildings & 13.8 KV Generator
Project Gallery
MIMAR provided an architectural and engineering study, and full design and construction services for the heating, ventilation, air conditioning, power, sanitary and wastewater plumbing for three service buildings at BWI. MIMAR coordinated its in-house design staff with the owner’s representatives and the URS Corporation, MIMAR’s project partner and specialist electrical power utility personnel, for two new Triturators (15R) and all attendant automation. Also, MIMAR oversaw design and installation of 13.8 Kv ATS transformer and supporting fiber optic system.