BWI Garage Improvements
Project Gallery
As part of a design team member with AECOM, Mimar provided architectural services for design and construction documents of all work relating to the alterations to the facade facing the main terminal and additions to the parking garage.
MIMAR was responsible for all work relating to the expansion, addition of two floors, alterations of facade facing the main terminal and additions to the Parking Garage. Services included assessment of existing conditions, design of electrical systems and new lighting, electrical for new elevators, development of construction documents, and specifications. MIMAR worked closely with AECOM and other consultants to coordinate architectural design with structural, mechanical, landscape and civil work. As time was of the essence, MIMAR worked diligently to finish the project within schedule, and produced nearly 60 architectural drawings within 20 weeks on an accelerated schedule.
The project included the addition of two floors in the existing garage for an addition of 400 parking spaces, and the addition of elevators, moving walkways, and public lobbies, and a 400,000 SF addition and renovation of existing spaces. On the first level of the garage, existing moving walkway was provided with a glass enclosure. In addition, 25 existing stair lobbies were enclosed with glass vestibules to provide air-conditioned spaces.